PELABUHAN TANJUNG PELEPAS (PTP) WHARF STRUCTURES BERTH 13 & 14 AT TANJUNG BIN, JOHOR DARUL TAKZIM

Cementaid® 3CC® System
Hydrophobic Pore-blocking Ingredients (HPI)

The Problems

Unfortunately, the previous 12 operational berths which are continuously exposed to seawater has been a constant concern to the PTP maintenance department.
The Project Description

Phase II of the PTP development involves (a) The construction of the approximately 2.9 km of wharf with related infrastructure; (b) The construction of an approximately 720 metres (Berth 13 & 14) length of the wharf; (c) Installation of crane rails for wharf gantry crane including all accessories along this length of wharf and a transition area between wharf deck and terminal yard of approximately 50m width consist of pavement roadwork, drainage, external and internal electrical system, water supply system, telephone ducting, SCADA system,high mast, sub-station and wharf office building and related works. .
The Solution

In view of the recurring maintenance problems plaguing the existing marine concrete structures, the Consultant, AECOM which was commissioned to provide multi-disciplinary consultancy services for the detailed survey, engineering design and supervision of wharves for the development of Phase 2: Berth 13 & 14 where AECOM’s key role in design optimization enhances the design aspects and construction works as well as providing potential cost savings to PTP has decided to use a time-proven HPI integral waterproofing concrete admixture to eliminate corrosion and PTP’s long term ownership costs for the service-life as well as maintenance-free structure of their new berths, namely the 3CC System. Cementaid’s 3CC System concrete prevents all the 11 mechanisms of corrosion to reinforced concrete from occurring for design and service life of the concrete structure. Relying on 3CC concrete, today’s owners are able to build enhanced performance marine structures faster, at a lower cost than trying to make old past conventional protection works, more profitably and far more safely with the support and backing of the Cementaid Group’s more than 50 years of successful track record of preventing corrosion in marine environments around the world.
CEMENTAID SDN BHD
9, Jln Kemajuan, 46200 P.J, Selangor Malaysia
Tel: (60) 37957 5344 Fax: (60) 3957 5210
Email: malaysia@cementaid.com
REG. No: 3284-P

Talk to us on
HOME      COMPANY PROFILE     LOCATIONS      CONTACTS
CORROSION PROOFING CONCRETE / MEMBRANE FREE WATERPROOFING / PLASTICISERS / OIL & SOLVENT PROOFING / DUSTPROOFING / COLOR SEALING / EPOXIES / RAPID HARDENING / RETARDING / SURFACE HARDENING / MORTAR & DAMPCOURSE ADMIXTURES